How much does it cost to charge an electric car at home in San Diego?
On SDG&E's EV-TOU-5 plan, charging during super off-peak hours (midnight to 6 a.m.) costs 12.3 cents per kWh as of November 1, 2026, versus 52.4 cents from 4 to 9 p.m., so when you plug in matters more than anything else. A Level 2 charger usually runs $1,200 to $2,800 installed if your panel can handle it, and in the City of San Diego it needs an electrical permit with a $246.39 inspection fee.
- Cheapest hours
- 12 a.m.-6 a.m.
- Avoid
- 4-9 p.m. daily
- Level 2 installed
- $1,200-$2,800
- City permit
- $246.39 inspection
EV-TOU-5 super off-peak, 12.3 cents/kWh from Nov. 1, 2026
On-peak, 52.4 cents/kWh at Nov. 1, 2026 prices
Typical 200A panel, per NRG Clean Power, Sept. 2026
Simple no-plan permit for a house, duplex or townhouse
The short version
- EV-TOU-5 prices effective Nov. 1, 2026: 12.3 cents super off-peak, 46.6 cents off-peak, 52.4 cents on-peak per kWh (SDG&E bundled customers)
- Summer on-peak on EV-TOU-5 was 80.3 cents per kWh in SDG&E's April 1, 2026 rate table
- The federal 30C home charger tax credit (30% up to $1,000) covered installs only through June 30, 2026
- City of San Diego EV charger permits for single-family homes need no plans; inspection is $246.39 per charger
- NRG Clean Power's September 2026 estimate: $1,200-$2,800 all-in for Level 2, or $4,500-$7,500 if the panel must be replaced
Charging at home in San Diego is cheap or expensive depending almost entirely on the clock. SDG&E's EV plans split the day into three price periods, and the gap between the cheapest and priciest hour is about four to one at November 2026 prices and about six to one in SDG&E's summer table. We checked SDG&E's EV plan page and rate tables, the City of San Diego permit bulletin and federal incentive listings on November 3, 2026. Your bill also carries SDG&E's daily fixed charge, explained in our base services charge guide.
What are SDG&E's EV charging rates right now?
SDG&E EV-TOU-5 prices per kWh
| Period | Hours | Nov. 1, 2026 price | Summer price (Apr. 1, 2026 table) |
|---|---|---|---|
| Super off-peak | Midnight-6 a.m. daily; SDG&E also lists weekdays 10 a.m.-2 p.m. and weekends/holidays until 2 p.m. | 12.3 cents | 12.9 cents |
| Off-peak | Remaining hours outside 4-9 p.m. | 46.6 cents | 50.6 cents |
| On-peak | 4-9 p.m. every day, including weekends | 52.4 cents | 80.3 cents |
Super off-peak
- Hours
- Midnight-6 a.m. daily; SDG&E also lists weekdays 10 a.m.-2 p.m. and weekends/holidays until 2 p.m.
- Nov. 1, 2026 price
- 12.3 cents
- Summer price (Apr. 1, 2026 table)
- 12.9 cents
Off-peak
- Hours
- Remaining hours outside 4-9 p.m.
- Nov. 1, 2026 price
- 46.6 cents
- Summer price (Apr. 1, 2026 table)
- 50.6 cents
On-peak
- Hours
- 4-9 p.m. every day, including weekends
- Nov. 1, 2026 price
- 52.4 cents
- Summer price (Apr. 1, 2026 table)
- 80.3 cents
Source: SDG&E Electric Vehicle Pricing Plans page and EV-TOU-5 Total Rates Table, checked Nov 3, 2026. Bundled (SDG&E generation) customers; excludes the daily Base Services Charge.
EV-TOU-5 is for customers who charge an EV at home or are on SDG&E's Solar Billing Plan; you switch in My Energy Center. SDG&E also offers EV-TOU, for homes with a separate meter just for the car (30.1 cents super off-peak), and EV-TOU-5-P, which adds $1.16 per kWh from 4 to 9 p.m. on up to 18 event days a year. If a community choice provider buys your power, SDG&E's delivery-only super off-peak price is 4.7 cents and the provider bills generation separately.

Scheduling the car to charge after midnight is the single biggest money saver on SDG&E's EV plans.
Do I need a Level 2 charger, or is a regular outlet enough?
Level 1 vs. Level 2 home charging
| Level 1 (standard outlet) | Level 2 (240-volt) | |
|---|---|---|
| Equipment | The cord that comes with the car | Wall unit, $400-$900 for 40-48 amp models |
| Install cost | None if a dedicated circuit is near your parking spot | $600-$1,200 for a short run; more for long runs or trenching |
| Best for | Short, regular commutes with long overnight parking (DOE) | Long commutes, big batteries, irregular schedules (DOE) |
| Fits in the 6-hour weekday cheap window? | Harder for a big top-up | Much easier |
| City permit | Not needed just to plug in; new wiring is permit work | Electrical permit required |
Level 1 (standard outlet)
- Equipment
- The cord that comes with the car
- Install cost
- None if a dedicated circuit is near your parking spot
- Best for
- Short, regular commutes with long overnight parking (DOE)
- Fits in the 6-hour weekday cheap window?
- Harder for a big top-up
- City permit
- Not needed just to plug in; new wiring is permit work
Level 2 (240-volt)
- Equipment
- Wall unit, $400-$900 for 40-48 amp models
- Install cost
- $600-$1,200 for a short run; more for long runs or trenching
- Best for
- Long commutes, big batteries, irregular schedules (DOE)
- Fits in the 6-hour weekday cheap window?
- Much easier
- City permit
- Electrical permit required
What a home charger setup typically costs
- Level 1No added cost if the circuit exists
Use the car's cord on an existing dedicated outlet
- Hardware
- Included with car
- Install
- $0
- Level 2, panel OKMost common case
Short run from a 200-amp panel
- All-in
- $1,200-$2,800
- Permit & inspection
- $100-$400
- Level 2 + load managerAlternative to a new panel
Device that shares capacity instead of upgrading
- Device
- $300-$700
- Plus install
- As above
- Level 2 + new panelHigher if SDG&E's meter or service drop changes
Panel upgrade to 200 amps
- All-in
- $4,500-$7,500
- Panel alone
- $2,500-$4,500
Installer estimates for California, NRG Clean Power, Sept. 9, 2026. A company that sells installs; get several quotes.
Do I need a permit to install an EV charger in San Diego?
City of San Diego permit for a house, duplex or townhouse
- 01
Apply online as a Simple No-Plan permit
Choose No-Plan - Residential - Combination Mech/Elec/Plum. Single dwellings, duplexes and townhouses need no plans or calculations, per Information Bulletin 187. Homes in historic districts must submit plans.
- 02
Fill out the circuit card
For a private garage, Circuit Card DS-1779A replaces electrical plans; the load calculation goes on the card and must be on site for inspection.
- 03
Pay the inspection fee
$246.39 per charger, plus an $11.34 mapping fee if it applies. Doing it yourself also requires the Owner-Builder Verification form, DS-3042.
- 04
Be home for the inspection
Inspectors won't open live equipment, so someone has to open the panel and give access to the charger and service equipment.

A City of San Diego inspection costs $246.39 per charger for a single-family home.
Are there rebates for home EV chargers in San Diego in 2026?
- Federal 30C tax credit: 30% up to $1,000 for a charger at your main home in qualifying areas, but the Department of Energy lists it as expired for installs after June 30, 2026
- County of San Diego EV Charger Program: up to $5,000 per Level 2 charger, but only for publicly accessible chargers; home chargers at single-family houses are excluded
- SDG&E: its EV plans are a rate discount, not a charger rebate; we did not find an active SDG&E home charger rebate on November 3, 2026
- Income-qualified help: the state's Access Clean California (AccessCleanCA.org) points eligible households to charging and vehicle programs
- Before buying, check DriveClean.ca.gov with your ZIP code, since programs open and close during the year. Pairing an EV with panels? See is solar worth it in San Diego.
Is this still right?
We last checked this tip against its sources on November 3, 2026, and we re-research every tip on a schedule. Things in San Diego change, sometimes overnight.
Prices, fees, hours and rules change, often at the start of a year or season. Confirm with the official source linked below before you rely on a number.
This is general information, not legal, financial, tax, medical or safety advice.
KEEP READING
SOURCES
Everything above traces back to one of these. Follow them — if one has changed and we haven't, that's our mistake, not yours.
SDG&E · Checked November 3, 2026
EV-TOU-5 prices effective Nov. 1, 2026; time periods; EV-TOU and EV-TOU-5-P details
SDG&E · April 1, 2026
Summer on-peak $0.80292, off-peak $0.50584, super off-peak $0.12852
City of San Diego Development Services · Checked November 3, 2026
Simple no-plan permit, DS-1779A circuit card, $246.39 inspection fee
U.S. Department of Energy, Alternative Fuels Data Center · Checked November 3, 2026
30% up to $1,000 for residential; expired 06/30/2026
U.S. Department of Energy, Alternative Fuels Data Center · Checked November 3, 2026
Level 1 vs Level 2 guidance; permits; continuous load
County of San Diego · Checked November 3, 2026
$5,000 per Level 2, public chargers only; single-family homes not eligible
NRG Clean Power · September 9, 2026
Installer's cost ranges; seller of installations
- BackgroundSDG&E Pre-Owned EV Rebate Plus listing
DriveClean.ca.gov (California Air Resources Board) · Checked November 3, 2026
SDG&E's EV listings are vehicle rebates and an EV rate, not a home charger rebate